Accomplishments
  • Installed a second set of baffles in the plant.
  • Took apart old baffles to construct more baffles with the updated design.
  • Calibrated and cleaned the turbidimeters and changed the trubidimeter tubings.
  • Changed pump and tube settler tubes
  • Cleaned the flocculation tank.
  • Created notes on the Aguaclara wiki on how to turbidimeter maintenance and calibration.
  • Prepared flocculation tank for future tests.
Outcomes
  • Baffles are installed, turbidimeters are working and calibrated so the plant can start running tests.
Issues
  • Still need to talk to Ian and work with him on FReTA