Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

...

Spring 2009 Minutes

June 26, 2009

Working Group: Fluidized Bed Method

Accomplishments

...

  • Put together the system with larger tubes and drilled out the necessary parts
  • Emailed Cameron and requested a web cam for the sand filter. Met with Cameron to clarify the request.
  • Finished the teach-in presentation
  • Started to revise the research proposal and detailed task list.
  • Started working on midterm wiki.
  • Worked with Matt on the leaking problem (See Issues below). Decided to order metal clamps. If that fails, we will attempt to place a very large fitting into the tubing
  • Decided to start literature searches while experimental setup is not working properly.
  • Decided to start going over MathCAD work while experiments are down.
Issues
  • Clogging in the sand filter needs to be addressed
  • Leaks in the system due to fitting/connector issues near pumps, may be due to pressure in the lines.
Goals for upcoming week
  • Fix leak problem
  • Fix clogging problem/find a minimum expansion for which clogging doesn't happen and use a greater expansion for subsequent experiments.
  • Finish revising midterm wiki
  • Finish revising research proposal/detailed task list.
  • Start the first planned set of experiments, hopefully.
Issues
  • Difficult and unresolved issues
  • Plans for action
Goals for upcoming week

...