...
- Sed. Inlet Slopes program adjusted so the measurement of the gap between the last plate & the wall is given.
- This gap will essentially be a fraction of a slope plate.
- Length of the slopes was altered so the corner closest to the wall determines the length (top of the slope doesn't need to be flush with the wall)
- Sludge drain width was altered to make sure enough width is given underneath the slopes to prevent breaking.
Metrics
- The number of actual ports/slopes in the sed tank was being overestimated. Upon review, it was found that the calculation of the port number was based on L.SedMax, not L.Sed (the actual length of the tank).
Outcomes
- Length of the slopes need to be altered.
- Sludge drain width needs to be altered to make sure enough width is given underneath the slopes to prevent breaking. Make sure it is at least 2.5cmFlocculator program corrected, although the draining system for each channel still needs to be determined.
Issues
- Other MathCAD issues from the task list are still being resolved.
...