...
- Cut pex tubing into .051 m pieces to use as spacers
- Finished second set of adjustable baffles to allow for hot swapping
- Cut and capped rapid mix tube to allow for higher plant flows since water level in the tube was already very high for a low flow rate and would overflow if increased
- Fixed where dosing of alum (or PAC) was taking place to guarantee appropriate mixing of coagulant before flocculation
- Before the coagulant took a really long time to get into the flocculator due to water backing up.
- Set up plant for dosing with polyaluminum chloride (PAC)
- Determined method for normalizing turbidity profile data
- Set up flow meter to read in L/min
...