  • Held a meeting with Monroe and the people in Honduras. It was a basic Q&A session and helped clear up a lot of things so we can proceed. (notes can be found on the Tasks page linked at the bottom)
Metrics
  • Quantitative and qualitative results from accomplishments and outcomes.
  • Potential metrics for unresolved issues.
Outcomes
  • A summary of resolutions based on what was accomplished.
  • New directions and ideas that result from these resolutions.
Issues
  • Team members continued to work on their individual tasks.
Outcomes
  • Decided that ports between channels will be located at the top of the wall instead of the bottom
  • Sludge drain dimensions will be constrained so that they must be able to cover a 3-4" pipe
  • The flocculator program has been changed & updated so each channel will have the same spacing. The channels have also been updated so the ports between channels match the spacing between baffles.
    • This program is currently being reviewed by Monroe.
    • A floc channel drain was also added to the program, as well as alternating ports on the bottom of the lower baffles for the tank to drain.
Issues
  • Chemical stock tanks need to be changed so that a volume and dimensions are given. This will give engineers the option of using barrels or building tanks.
  • In order to determine baffle thickness the baffle area needs to be included
  • Difficult and unresolved issues
  • Plans for action

Any Overall Team Comments:

...