October 10, 2008
Accomplishments
- Removal of Setup uniform baffles from in the flocculator.
- Repair of Repaired leak in the sedimentation tank.
- Performed trial run with alum pump and flocculator.
- Performed setup of baffles for the tapered baffles.
Metrics
Outcomes
- Add Outcomes here
Issues
- Setup turbidimeters and tube settlers.
- Organized lessons for next week's group meeting.
- Updated and organized Wiki.
Outcomes
- Will be able to run the pilot plant now that the leaks have been repaired.
- Wiki page for the Uniform Vertical Flow Hydraulic Flocculator updated and organized.
- Determined which topics will be taught in the next group meeting by each member of the Pilot Plant team.
Issues
- Continue to update and organize Wiki page for Uniform Vertical Flow Hydraulic Flocculator.
- Need to perform a complete trial run in the entire Pilot Plant with fixed leak and alum pump.
- Add Issues Here