Team Name Here Meeting Minutes

Fall 2008 Minutes

October 10, 2008

Accomplishments

  • Setup uniform baffles in the flocculator.
  • Repaired leak in the sedimentation tank.
  • Performed trial run with alum pump and flocculator.
  • Performed setup of baffles for the tapered baffles.
  • Setup turbidimeters and tube settlers.
  • Organized lessons for next week's group meeting.
  • Updated and organized Wiki.

Outcomes

  • Will be able to run the pilot plant now that the leaks have been repaired.
  • Wiki page for the Uniform Vertical Flow Hydraulic Flocculator updated and organized.
  • Determined which topics will be taught in the next group meeting by each member of the Pilot Plant team.

Issues

  • Continue to update and organize Wiki page for Uniform Vertical Flow Hydraulic Flocculator.
  • Need to perform a complete trial run in the entire Pilot Plant with fixed leak and alum pump.