Linear Flow Orifice Meter Meeting Minutes
Fall 2008 Minutes
September 16, 2008
Accomplishments
- Outlined goals for this semester with Monroe.
- Discussed progress made by monroe on LFOM background information.
Outcomes
- This semster I should work on studying the details guiding assumptioins about pipe diameter selection (test point of failure due to small pipe diameter)
- Work needs to be dome on the general design algorithm
Issues
- Why is 5 bottom row holes the magic number that creates correct hole positioning ?
- How does vertical hole spacing effect results?
{"serverDuration": 55, "requestCorrelationId": "7510798467229f4d"}