Linear Flow Orifice Meter Meeting Minutes

Fall 2008 Minutes

September 16, 2008

Accomplishments

  • Outlined goals for this semester with Monroe.
  • Discussed progress made by monroe on LFOM background information.

Outcomes

  • This semster I should work on studying the details guiding assumptioins about pipe diameter selection (test point of failure due to small pipe diameter)
  • Work needs to be dome on the general design algorithm

Issues

  • Why is 5 bottom row holes the magic number that creates correct hole positioning ?
  • How does vertical hole spacing effect results?