CFD Goals

Fall 2008 Team Members

Yong Sheng Khoo

Jesse Prager Prager

Fall 2008 Goals

  • Decide on the turbulence model for modeling our flow (Use K-e realizable or K-w SST)
    • Do literature search
    • Compare different turbulence model with the experimental data of backstep flow
  •  Obtain the Gtheta value from Fluent and compare with theoretical value
    • Use the user defined function in Fluent to add up each individual cell values
    • Further studies of user defined function is needed to carry out this task
  • Analyze the effect of Reynolds number the properties of the flow
    • Use the available paper experimentationFluent to plot energy dissipation rate, strain rate, pressure contour etc
  • Model the whole flocculator instead of just one baffle turning
  • Explore the different geometric space
    • Look for optimal geometry that will give a evenly distributed energy dissipation rate
    • Look for geometry that will give the maximum Gtheta

Goals for next semester!

Gantt chart

Task

Completion Date

Literature Research on Turbulence Modeling Edit/work on Mathcad code

9/22 Install Lever

Understanding how to use UDF

9/29 Run First Experiment (2-4 trials per week) 22

Compare different turbulence model with experimental data

10/8 Two more tests 5

Finalize the choice of turbulence model

10/17 Two more tests

Use UDF to find the Gtheta

10/20

Analyze the effect of Reynolds number on flow properties

10/24

Write up Mid-term results

?

Analyze Results compared to Computer expectations

10/31 Work on Mathcad to consider exp. results 30

Model flocculator in a larger scale (more turnings)

11/12 Run two more tests

Explore the different geometric space

11/19 Run two more tests

Read up literature on flocculator geometry

11/26

Rough draft of a second scientific paper Create a model for optimal geometry 

12/8

Complete Rough draft for Final Report

12/8

Final Report Due

12/12