Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Challenges for Spring 2009 Pilot Plant Team

Number of team members needed:

3 returning and 1-2 new members

Important team member skills:

...

  • Alter the tube flocculat set-up to minimize air trapped from joints and it has a more permanent location at the plant.
  • Set up FReTA to be used with the tube flocculator
  • Use FReTA to compare settling velocities at different points in the tube flocculator
  • Compare raw water readings from the Pilot Plant FReTA with the laboratory results

Sed Tank

  • Discover how much time it takes to form a sludge blanket.
  • Can a sludge blanket form if the lamella are present? Can the lamella be designed differently so that this is possible?
  • What is the best way to drain a sed tank so aas to cause the least amount of distrubance. How often would this need to occur?