Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Spring 2008 Team Members

Leah Buerman

Goals

  1. Revise and perfect mathcad code developed from fall 2007.
  2. Construct a trial automated flow control device.
  3. Test the device to determine efficacy.
  4. Compare results with those expected from mathcad and make necessary code changes.
  5. Experiment with the trial device until the experimental results match the predictions.
  6. Publish scientific paper (and Wiki) on automated flow control device.

Gantt Chart

Task

Completion Date

Finish Updating the Wiki

2/10

Edit/work on Mathcad code

2/13

Obtain Materials for experiment and location for Exp. set-up

2/18

Run First Experiment (2 trials per week)

2/25

Two more tests

3/3

Two more tests

3/10

Write up Mid-term results

3/14

Analyze Results compared to Computer expectations

3/28

Work on Mathcad to mimic exp. results

4/4

Run two more tests

4/11

Run two more tests

4/18

Complete Rough draft fo Final

4/25

Final Due

5/2

...