Demo Plant Spring 2008 Sedimentation Tank Design
...
Design Goal
Theoretical Design
...
Possible Design Results
Perpendicular Open Top
...
Design
blob
Old page stuff..
The new sedimentation tank design proposed in Spring 2008 will address the problem of uneven flow lengths, rates, and shears through each lamella of the sedimentation tank in the Spring 2007 Demo Plant. This problem is further described in the Demo Plant Problems Encountered page.
...
The MathCAD design and AutoCAD drawing of the proposed sedimentation tank have been uploaded.
Open Top Design
blob
Open Top Parallel Lamella Design
blob