Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Spring

...

2008

...

Demo

...

Plant

...

Sedimentation

...

Tank

...

Design

...

The

...

new

...

sedimentation

...

tank

...

design

...

proposed

...

in

...

Spring

...

2008

...

will

...

address

...

the

...

problem

...

of

...

uneven

...

flow

...

lengths,

...

rates,

...

and

...

shears

...

through

...

each

...

lamella

...

of

...

the

...

sedimentation

...

tank

...

in

...

the

...

Spring

...

2007

...

Demo

...

Plant.

...

This

...

problem

...

is

...

further

...

described

...

in

...

the

...

Demo

...

Plant

...

Problems

...

Encountered

...

page.

...

The

...

proposed

...

sedimentation

...

tank

...

will

...

be

...

oriented

...

perpendicular

...

to

...

the

...

axis

...

of

...

the

...

flocculator.

...

Additionally,

...

to

...

accommodate

...

the

...

new

...

design,

...

water

...

will

...

exit

...

the

...

flocculator

...

from

...

the

...

top,

...

instead

...

of

...

the

...

bottom.

...

In

...

order

...

to

...

eliminate

...

differences

...

in

...

lengths

...

of

...

flow

...

paths

...

through

...

the

...

sedimentation

...

tank,

...

water

...

exiting

...

the

...

flocculator

...

will

...

be

...

split

...

into

...

several

...

tubes

...

of

...

equal

...

diameters

...

and

...

lengths,

...

which

...

will

...

enter

...

the

...

bottom

...

of

...

the

...

sedimentation

...

tank.

...

The

...

tubes

...

entering

...

the

...

sedimentation

...

tank

...

will

...

be

...

evenly

...

spaced.

...

The

...

sedimentation

...

tank

...

itself

...

will

...

be

...

redesigned

...

so

...

that

...

lamella

...

still

...

form

...

the

...

optimal

...

60

...

degree

...

angle.

...

However,

...

the

...

lamella

...

will

...

now

...

guide

...

the

...

water

...

in

...

a

...

path

...

parallel

...

to

...

the

...

axis

...

of

...

the

...

flocculator,

...

so

...

that

...

the

...

whole

...

tank

...

will

...

have

...

an

...

incline,

...

and

...

will

...

need

...

to

...

be

...

either

...

very

...

bottom-heavy,

...

or

...

have

...

a

...

support

...

for

...

the

...

upper

...

ends

...

of

...

the

...

lamella.

...

This

...

design,

...

along

...

with

...

the

...

new

...

entry

...

method,

...

will

...

normalize

...

the

...

head

...

loss

...

through

...

individual

...

channels

...

in

...

the

...

sedimentation

...

tank.

...

The

...

proposed

...

sedimentation

...

tank

...

will

...

also

...

incorporate

...

an

...

open-top

...

design,

...

similar

...

to

...

the

...

flocculator

...

of

...

the

...

Fall

...

2007

...

Demo

...

Plant.

...

This

...

design

...

also

...

allows

...

us

...

to

...

consider

...

the

...

incorporation

...

of

...

a

...

drain

...

for

...

built

...

up

...

sediments

...

in

...

the

...

sedimentation

...

tank,

...

adding

...

the

...

functionality

...

to

...

clean

...

the

...

sedimentation

...

tank

...

while

...

the

...

plant

...

is

...

still

...

running.

...

The

...

MathCAD

...

design

...

and

...

AutoCAD

...

drawing

...

of

...

the

...

proposed

...

sedimentation

...

tank

...

have

...

been

...

uploaded.*
Image Added