Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

I was a member of the Ram Pump team for the 2013 Summer internship program. I contributed to the ram pump by helping to repair leaks and designing a more efficient waste valve. I helped preform tests and discussed with my team about how to interpret the results. I also helped construct a new drive system that would allow for the team to test a wider variety of drive flows.

Fall 2013 Contributions

I am As a member of the Ram Pump team for the Fall 2013 semester. Our goals for the semester are to perform more tests on the ram pump and use the results to construct a mathematical model that can be used to design pumps for different conditions. We will also continue to improve the efficiency of the pump. This will involve testing various air chamber sizes and waste valve constructions. , I assisted the new team in becoming familiar with the ram pump. I gave detailed explanations on the research that had been done over the summer as well as suggestions for further research. I also helped design and construct a new apparatus for testing the ram pump.