Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Once the SRSF was completed, we made minor adjustments to ensure proper positioning on the new frame relative to other processes. Also, I have helped set up and break down the Demo Plant at Demo Plant at the Tau Beta Pi Science and Engineering Fair and Engineering Student Project Team Showcase. After finishing the Demo Plant for the EPA P3 competition, we systematically measured and documented the headlosses through the tubing, connectors, and valves. I helped consolidate the MathCAD design file for the demo plant and wrote parts of the teach-in presentation, user manual, and research report drafts.