Additionaly, the the frame work includes a table to hold a small stock tank and another table to hold the constant-flow device. As determined in the design of the constant head device, there should be ideally 30 cm between the orifice and the low water lever of the stock tank. This dimension has been taken into account in our design. **Find and link this page

Fig 1.0 Isometric View

Fig 1.1 Top View

...

 80/20 Inc. is a manufacturer of modular aluminum framing system.  80/20 components are used extensively throughout our lab and specifically in this project.  This section provides some details to assist getting started with these components and using them in design. 

http://www.8020.net/  This is the main web page for this company.  Available is a complete on-line catalog, price catalog and design ideas.  Design is made easier using their "Auto-cad Plug-In."  All components and frames are available with this Plug-In making requiring only limited Auto-cad knowledge for a professional looking design. 

...

 Two local distributors are: Ralph  

Ralph W. Earl Inc.
5930 E.Molloy Rd.
Syracuse NY 13220
315-454-4431
rwearl@rwearl.com

Specifically- Bob Prosher:bproscher@rwearl.com.  Competent and helpful salesman.
Hughes Industrial
9685 Main St.
Clarence NY 14031
800-759-8374
www.hughesind.com

 Ordering Information

 The Bill of Material Materials.pdf  as generated by the AutoQuoter program and is attached.  Bob Proscher from Ralph W. Earl Inc was able to procure a 40% discount for us on materials.  The order for these components was submitted to Christene Day on November 17,2009 and parts were received on  We are currently waiting on receipt of the materials to continue on the project.

**Attach the BOM here

Bibliography

...

By the end of the semester we intend to have a functional, full scale non-linear chemical doser.In order to accomplish this, this sub-group needs to complete the following:

  • Complete final changes to Autocad drawing to represent changes in the bracketing.
  • Talk to Paul Charles about fabrication of the bushing and drilling of the lever-arm
  • Update Material's List
  • Contact 80/20 distributor about pricing. Plan to discuss the possibility of having them sponsor our frame
  • Order and receive components. Assemble according to Autocad Dwg.
  • Install hydraulic components