Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Cut pex tubing into .051 m pieces to use as spacers
  • Finished second set of adjustable baffles to allow for hot swapping
  • Cut and capped rapid mix tube to allow for higher plant flows since water level in the tube was already very high for a low flow rate and would overflow if increased
  • Set - up plant for dosing with polyaluminum chloride (PAC)
  • Determined method for normalizing turbidity profile data
  • Set up flow meter to read in L/min
Outcomes
  • Plant is nearly ready for testing.

...