Q = 100 L/min
K.baffle = 4
Π.cell = 1
w = 12 in.305 m
b = various spacings (in)

b (inm)

ε (mW/kg)

2" .0051

49.099

3" .076

9.699

4" .102

3.069

5" .127

1.257

6" .152

0.606

7" .178

0.327

8" .203

0.192

Outcomes
  • Have range of values of spacings to be tested with adjustable baffle system to find an optimal energy dissipation rate. With both sets of baffles done and a range of dissipation rates to test we can turn on the plant and begin taking turbidity profiles.

...