- Quantitative and qualitative results from accomplishments and outcomes.
- Potential metrics for unresolved issues.
Outcomes
- A summary of resolutions based on what was accomplished.
- New directions and ideas that result from these resolutions.
Issues
- Decided that ports between channels will be located at the top of the wall instead of the bottom
- Sludge drain dimensions will be constrained so that they must be able to cover a 3-4" pipe
Issues
- Chemical stock tanks need to be changed so that a volume and dimensions are given. This will give engineers the option of using barrels or building tanks.
- In order to determine baffle thickness the baffle area needs to be included
- Difficult and unresolved issues
- Plans for action
Any Overall Team Comments:
...