Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Installed a second set of baffles in the plant.
  • Took apart old baffles to construct more baffles with the updated design.
  • Calibrated and cleaned the turbidimeters and changed the trubidimeter tubings.
  • Cleaned the flocculation tank.
  • Changed all of the tubings for the pumps, turbidimeters, and tube settlers
  • Created notes on the Aguaclara wiki on how to turbidimeter maintenance and calibration.
  • Prepared flocculation tank for future tests.

...

  • Still need to talk to Ian and work with him on FReTA
Pictures


Image Added          
      


Image Added          
      


Image Added          
      


Image Added          
      


Image Added          
      


Image Added