Accomplishments

11/09/08

  • removed sutro-weir support structure
  • played with alum dosing making sure flow rate stays steady and used tank light to determine optimal floc formation
  • bought pvc and created connection, so the inlet doesn't pour in over baffles
  • bought pvc pipe to cut to reconfigure uniform spacing
  • replaced light bulb in tank light, so we can observe floc formation in the flocculator

11/10

  • determined that energy dissipation in uniform flocculator was too low

11/11

  • Henry and Christine cut pvc piping for uniform baffles (15cm).
  • played with alum dosing instead of increment

11/13

  • met with Monroe

11/15

  • replaced uniform baffles with tapered baffles
  • took apart uniform baffles
  • began to replace with 15 cm spacing but decided against it because there might not be enough energy dissipation
  • alum pump failure due to stamp box disconnection while replacing baffles
  • need to fix stamp box

11/16

  • fixed stamp box by unplugging/ replugging connections,
  • set up siphon to clean tank
  • discussed options for tube flocculator tubing/ set up with Mark
  • discussed options for grounding tank/ need to ask tom
  • played with alum dose

11/17

  • MathCAD tutorial
  • determined baffle spacing with minimum energy dissipation requirement of .4 mW/kg

Outcomes

  • need to replace baffles in uniform flocculator and end of tapered flocculator with 13 cm spacing
  • need to replace baffles/ recut pvc
  • Tom is ordering tubing for tube flocculator

Issue