Pilot Plant Sedimentation Tank Meeting Minutes

Fall 2008 Minutes

September 18, 2008

Accomplishments

  • Julia and Kellie finished caulking the pipes.
  • Team reviewed wiki pages.
  • Team met at pilot plant on 09/18/08.
  • Julia discussed with Sarah the configuration of the tube flocculator and the alum dose needed to form a floc blanket over time.
  • Team goals for the semester were updated.

Outcomes

  • Could not fully start up the plant because some of the caulk is not dry.
  • Much of the sludge build-up was pumped out of the tank.
  • Work on the wiki page was discussed and divided up among the sub-teams. Christine will work on the Tube Flocculator pages, while Kellie and Shaina rearrange different parts of the Sedimentation Tank page.

Issues

  • Our method for pumping sludge out of the tank is unnecessarily time-consuming. We will try to find a different way.
  • Since we could not start up the plant, Shaina will return on 09/19/08 to check the caulk and begin the running the plant with a 20 mg/L alum dose if the caulk is dry. We need to run the plant consistently at this concentration for some time before we can form a floc blanket.
  • No labels