Design Team Meeting Minutes
Spring 2009 Minutes
2/6/09
Accomplishments
- Assigned Tasks to each member:
• Change flocculator energy dissipation program back to handle arrays so that we can have uniform and tapered baffle spacing
o Fix the placement code for the baffles Sara
• Change drain so that the pipe is now a rectangular channel Heather H
• Change inlet "pipes" so that they are inlet rectangular columns
o Not longer than width of inlet channel or wider then width of inlet slope Adela
• Need to modify the slopes program so that the widths of the slopes are the width of the sed tank/2 - the width of the dran/2. Width of the drain is set. Height of the drain is a variable Heather R
• Adjust the entrance tank so that the dimensions of the tank are specified based on an entrance tank upward velocity, which is 700m/day which is 1/10th the size of the sed tank. Depth is constrained by the floating floc people. Reiko
Metrics
- Quantitative and qualitative results from accomplishments and outcomes.
- Potential metrics for unresolved issues.
Outcomes
- A summary of resolutions based on what was accomplished.
- New directions and ideas that result from these resolutions.
Issues
- Difficult and unresolved issues
- Plans for action
Working Group: 2
Accomplishments
- A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
Metrics
- Quantitative and qualitative results from accomplishments and outcomes.
- Potential metrics for unresolved issues.
Outcomes
- A summary of resolutions based on what was accomplished.
- New directions and ideas that result from these resolutions.
Issues
- Difficult and unresolved issues
- Plans for action