Design Team Meeting Minutes

Spring 2009 Minutes

2/27/2009

Accomplishments
  • Reiko & Heather H created a design outline for Ecuador
  • Heather R & Adela worked on design for Gracias.
  • Both groups and Sara debugged the programs.
  • Assigned presentation material for teach in on Monday: Heather R- Overview, Sara- Goals and timeline, Reiko- Ecuador and challenges, Adela- Gracias, Heather H- Cuatro Comunidades
Metrics
  • Ecuador preliminary plant design written up and sent to Hugo Castillo.
Outcomes
  • Decided to start thinking about how to not have the water height as an input.
  • Want to start thinking about including energy dissipation instead of Gtheta.
Issues
  • We need to go through the programs and make sure they are not referencing files from when they were being tested.
  • Problems with entrance tank and flocculator files, need to look at them
  • No labels