Design Team Meeting Minutes

Spring 2009 Minutes

Friday, March 13, 2009

Accomplishments
  • Updated algorithms for new geometries
    • Sludge drain: change from pipe to channel
    • Inlet channel: change from drop pipes to chimneys
  • Entrance Tank algorithm now calculates dimensions of the tank and incorporates a grid chamber in the design
    • LFOM code deleted
  • Completed slopes program for sedimentation tank
    • Adjusted variable names
  • Updated Master Program to incorporate new designs
    • Deleted any unnecessary information
    • Added dimensions thought to be useful
Metrics
  • Quantitative and qualitative results from accomplishments and outcomes.
  • Potential metrics for unresolved issues.
Outcomes
  • New programs need to be copied into the master file
    • Current program/algorithm changes were made to the Gracias file; the programs need to be copied to all other designs
  • Need a new page for Hopper algorithm
  • AutoCAD can now be updated
Issues
  • Need to make sure documentation is completed for program changes
  • Continue checking code for variable name changes

Any Overall Team Comments:

  • No labels