The Design Team: Summer 2014 Program.

The major goals of this summer are to update the Automated Design tool with some of the progress made during the Spring 2014 semester, namely with the Chemical Dose Controller details and the Weir Control System for the SRSF. Other goals include continued work on the Low Flow Plant design, sloping the floor of the Flocculator Tank, and eliminating the slab beneath the sedimentation tank.

Current Members

Meghan Furton
Serena Takada

  • No labels