PSS Meeting Minutes

Fall 2008 Minutes

11/21/08

Accomplishments

  • We change one of the flocculator due to a build up of what looks like mold.
  • Tested out the system for air leaks, turbidity control and
  • Tested the floc production with half the flow rate, then increased back to our desired level

Metrics

  • none

Outcomes

  • We are getting adequate floc production with our ideal flow rate

Issues

  • We need to make a stable floc blanket
  • We are begining to record data and will be running official experiments starting this weekend.
  • We are begingng to document the improvements of the set up and the methods for running the system.
  • No labels