You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 19
Next »
Spring 2011 Challenges
The following documents are copied from Fall 2010 and are thus only drafts. The goal is to edit this before the spring semester begins! All edits should be made to the attached word documents. Do NOT create files with new names. Instead simply replace the existing file with the revised file.
Design (15) in Accel
Sedimentation (4) in B60
Tube Floc (4) in B60
Stacked Filtration (6) in B63 along window: two team members as joint members of Design team
Foam Filtration (4) in B63 on right end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Outreach (6-8)
(estimated number of students per team)
New Challenges
{"":"Challenges New Spring 2011.doc","0":"Challenges New Spring 2011.doc","type":"doc","pageID":"122816405"}
Team organization survey
{"":"Challenges Design Spring 2011.doc","0":"Challenges Design Spring 2011.doc","type":"doc","pageID":"134219730"}
{"":"Challenges Sedimentation Spring 2011.doc","0":"Challenges Sedimentation Spring 2011.doc","type":"doc","pageID":"134219745"}
{"":"Challenges Tube Floc Spring 2011.doc","0":"Challenges Tube Floc Spring 2011.doc","type":"doc","pageID":"134219756"}
{"":"Challenges Stacked Filtration Spring 2011.doc","0":"Challenges Stacked Filtration Spring 2011.doc","type":"doc","pageID":"134219759"}
{"":"Challenges Foam Filtration Spring 2011.doc","0":"Challenges Foam Filtration Spring 2011.doc","type":"doc","pageID":"134219765"}
{"":"Challenges Plate Settler Spacing Spring 2011.doc","0":"Challenges Plate Settler Spacing Spring 2011.doc","type":"doc","pageID":"134219772"}
{"":"Challenges Chemical Dose Controller Spring 2011.doc","0":"Challenges Chemical Dose Controller Spring 2011.doc","type":"doc","pageID":"134219776"}
{"":"Challenges Outreach Spring 2011.doc","0":"Challenges Outreach Spring 2011.doc","type":"doc","pageID":"134219783"}