Pilot Plant Meeting Minutes
Spring 2009 Minutes
March 27, 2009
Working Group: 1
Accomplishments
- Caulked holes from previous baffle layouts for 32 baffles to allow for reuse on secondary baffle system setup
- Drilled holes and cut baffles according to Adjustable Baffle System design
- Cut Pex tubing as spacers for secondary baffle system
- Assembled secondary baffle system
Outcomes
- Completed secondary baffle system to allow for one system to be adjusted while another system is in the tank being tested
Working Group: 2
Accomplishments
- Calculated range of non-tapered baffle spacings to be tested using an energy dissipation rate of 0.4 mW/kg (various increments around the spacing for 0.4 mW/kg).
- Using 0.4 mW/kg because that is the energy dissipation rate used by the Design team
Metrics
- Put calculations of baffle spacing for energy dissipation rate of 0.4 here
Outcomes
- Have range of values of spacings to be tested with adjustable baffle system