Accomplishments
- Added another vertical column for flocculator to system and process control.
- Added a air tube open to the atmosphere after flocculator. The air tube help extract the air bubbles.
- Remove the buffer before the flocculator to simplify the system.
- Raised the temperature controlled water tank onto two 7in cement blocks.
- Formed floc in the flocculator
Metrics
- Discussed height-dependence of water tank.
Outcomes
- Effluent turbidity meter functions properly.
Issues
- Floc production is not fully developed; there are still small floc.