Design Meeting Minutes

Summer 2009 Minutes

7/3/2009

Accomplishments
  • Changed chimneys in sed tank

Floc Hopper Group

Accomplishments
  • Created the wiki page for the floc hopper, along with the inputs and outputs pages.
  • Continued work on MtoA code for floc hopper design.
Issues
  • Had trouble getting our MtoA code to output a correct text file.
  • Will consult Heather or Monroe at meeting on Tuesday to correct this problem.
Goals for upcoming week
  • Complete MtoA code on the actual floc hopper design.

Floc Tank Group

Accomplishments
  • Exit port is now where it belongs
Issues
  • The number of baffles in the last channel must now be an even number
Goals for upcoming week
  • Ensure that the number of baffles in the last channel is an even number
  • Draw slots to slide the baffles into

Exit Channel Group

Accomplishments
  • Program has been completed and documented
  • Necessary information as well as AutoCAD renderings are available on the Wiki
  • Tested and functioning

Materials List Group

Accomplishments
  • Created wiki page for Materials List
  • Created Input and Outputs pages for Materials List
  • Finished all plant and channel walls
  • Worked on calculations for Sed Plate Frame and other pipe components
Issues
  • Had trouble understanding some of the pipe and valve components
  • Had to figure out how to create, format, and publish a new wiki page with MathType and Inputs and Outputs
Goals for upcoming week
  • Work on pipes and find out more information about pipes and valves that go between channels
  • Find dimensions and calculate volumes for Inlet Channel chimneys, weirs, and channel tanks