PSS Meeting Minutes
Spring 2009 Minutes
4/24/09
Accomplishments
- Ran experiments with 23.8mm tube with a low and high floc blanket at various flow rates.
- Anazlyzed data for recent experiments.
- Compared data points for all the experiments performed this semester.
- Updated Collete's leader status on the wiki team members page.
- Mathcad file for data analysis is fixed and working!
Outcomes
- Need to determine what length tubes we will test this next week.
- Determined optimal Vc based on performace of tubes in recent experiments.
Issues
- Still have not begun running experiment 2, where we pick an L/b ratio and a Vc to test the effect of tube diameter.
- Still working on effective drag on a floc.