Fall 2010 Research
The following documents summarize the work coompleted during the Fall 2010 semester:
- Fall 2010 Challenges for the Tube Floc Team
-Lists and some guidelines/plans for the goals and challenges the team hopes to reach during the Fall semester 2010. [Fall 2010 Tube Floc Reflection Report 1|^ReflectionReport1.doc] provides details on our initial work during the semester to identify problems with FReTA and troubleshoot them, as well as finalizing our task list for the semester.
- Fall 2010 Tube Floc Reflection Report 2 provides details on the adjustments made on the Process Controller states ramp down and ball valve close based on the readings of the pressure sensor.