You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »


Fall 2010 Research

The following documents summarize the work coompleted during the Fall 2010 semester:

  • Fall 2010 Challenges for the Tube Floc Team
    -Lists and some guidelines/plans for the goals and challenges the team hopes to reach during the Fall semester 2010.
  • [Fall 2010 Tube Floc Reflection Report 1|^ReflectionReport1[1].doc] provides details on our initial work during the semester to identify problems with FReTA and troubleshoot them, as well as finalizing our task list for the semester.

  • Fall 2010 Tube Floc Reflection Report 2 provides details on the adjustments made on the Process Controller states ramp down and ball valve close based on the readings of the pressure sensor.
  • No labels