I am working on updating the current Demo Plant to overcome existing failure modes. The main tasks for the semester are eliminating the flocculator overflow; increasing the capacity of stock tanks to achieve a continuous run time between 15-30 minutes without intervention; and updating the plant frame for ease-of-use during set-up and break-down.
Overview
Content Tools