Recipe

Chip Spinning:

  1. spin 4% 495 PMMA (solvent anisole) @ 3000 rpm, 1000 ramp, 60 s (resist will be ~150 nm thick)
  2. bake @ 170 °C for 15 min
  3. spin 2% 950 PMMA (solvent MIBK) @ 3000 rpm, 1000 ramp, 60 s (resist will be ~50 nm thick)
  4. bake @ 170 °C for 15 min

E-beam Writing on the Nabity:

  1. Measure the current in pA for each aperture setting (typically 10 µm aperture for fine contacts & 60 µm aperture for probe (big) contact pads).
  2. Set up run files (see screenshots below).

Parameters common to all run files:

  • gun @ 20 kV
  • 900 magnification

General Parameters:

  • Non-stop writing mode ⇒ yes
  • Disable automated stage control ⇒ no
  • Disable digital SEM control ⇒ no
  • Disable x-y focus mode ⇒ yes
  • Enable global rotation correction ⇒ no
  • alignment windows: counts of 15; center-to-center & line spacing of 50 nm
  • fine contacts: continuous write; center-to-center & line spacing of 5 nm; 300 µC/cm^2 area dose
  • big contact pads: continuous write; center-to-center & line spacing of 30 nm; 300 µC/cm^2 area dose

Development

45 sec in 1:3 MIBK:IPA (shake chip back-and-forth in soln) & quench in IPA; N2 dry

Liftoff

1:1 methylene chloride:acetone overnight

Walk-through

step 1 - copy gds file into this directory:

step 2 - right click to convert gds to dc2:



step 2.1 - change drawing unit size to 1 and press convert:



step 3 - right click on new dc2 file and select DesignCAD Express:



step 3.1 - click NPGS - setdump



step 3.1.1 - the dump point is green:



step 3.2 - click NPGS - MaxMag:



step 3.3 - click NPGS - save - exit when done - then re-open to double check dump existence:



step 4 - right click on dc2 - choose run file editor:



step 4.1 - for fine contacts process 2 entities - set params as shown - pattern name is name of dc2 file:



step 4.2 - 1st entity is alignment - set params as shown - insert measured beam current in pA:



step 4.2.1 - skip all non alignment layers:



step 4.3 - 2nd entity for fine contacts - skip all alignment layers - change line to area dose:



step 4.3.1 - enter params as shown - same for each layer! - skip contact pad layer - remember to update measured current



step 4.4 - save run file - extension RF6 - and exit:



step 5 - find run file - right click - process run file:



step 5.1 - click continue - the writing will start!



step 6 - set up contact pad exposure - use these params:



step 6.1 - skip all but contact pad layer - enter params - remember to update measure current - proceed as before:




 