Experiment 2: Ramp State Function with 15.3mm Tube Settler Diameter
This experiment starts with a flow rate of 6 mL/min and gradually increases to a flow rate of 140 mL/min over the course of 24 hours
Figure 1: Effluent Turbidity vs. Flow Rate
This experiment starts with a flow rate of 6 mL/min and gradually increases to a flow rate of 140 mL/min over the course of 24 hours
Figure 1: Effluent Turbidity vs. Flow Rate