You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Ariel Seidner's Individual Contribution Page

Fall 2013 Contributions

The Agua Clara Ram Pump team's  hopes for this semester are, first and foremost to develop a efficient and durable Ram Pump to be used and installed at the Las Vegas, Honduras water treatment plant during early 2014. As a new member, my goals will be to assist the team to finalize and optimize the existing ram pump, develop a mathematical and theoretical explanation for the functions of the ram pump, implement a effective and simple way of determining air pressure in the air chamber (for the operator) and assist in its construction in Honduras.

  • No labels