Spring 2011 Challenges
Design (15) in Accel
Inlet Manifold (4) in B60
Tube Floc (4) in B60
Stacked Filter (6) in B63 along window: two team members as joint members of Design team
Foam Filter (4) in B63 on left end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Outreach (3-5)