You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Fall 2010 Challenges for the Tube Floc Team
-Lists and some guidelines/plans for the goals and challenges the team hopes to reach during the Fall semester 2010.

Fall 2010 Tube Floc Reflection Report 2 provides details on the adjustments made on the Process Controller states ramp down and ball valve close based on the readings of the pressure sensor.

  • No labels