You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 17 Next »

Fall 2010 Challenges

Design (15) in Accel
Inlet Manifold (4) in B60
Lime Feeder (4) in B63 along wall next to the door
Tube Floc (4) in B60
Stacked Filter (6) in B63 along window: two team members as joint members of Design team
Foam Filter (4) in B63 on left end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
(estimated number of students per team)

Team organization survey

Loading

Loading

Loading

Loading

Loading

Loading

Loading

Unable to render {include} The included page could not be found.
  • No labels