Fall 2010 Challenges
Design (15) in Accel
Inlet Manifold (4) in B60
Lime Feeder (4) in B63 along wall next to the door
Tube Floc (4) in B60
Stacked Filter (6) in B63 along window: two team members as joint members of Design team
Foam Filter (4) in B63 on left end of bench top (Pending revision by Sarah S.)
Plate Settle Spacing (4) in B60 (Pending revision by Matt H.)
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
(estimated number of students per team)
Team organization survey
{"":"Design Team Fall 2010 Challenges.doc","0":"Design Team Fall 2010 Challenges.doc","type":"doc","pageID":"124947192"}
{"":"Inlet Manifold Challenges for Fall 2010.doc","0":"Inlet Manifold Challenges for Fall 2010.doc","type":"doc","pageID":"124947197"}
{"":"Revised ANC Fall2010Challenges.doc","0":"Revised ANC Fall2010Challenges.doc","type":"doc","pageID":"124947199"}
{"":"Challenges Tube Floc Fall 2010.doc","0":"Challenges Tube Floc Fall 2010.doc","type":"doc","pageID":"124947204"}
{"":"Revised Challenges Stacked Filter Fall 2010.doc","0":"Revised Challenges Stacked Filter Fall 2010.doc","type":"doc","pageID":"124947209"}
{"":"Revised Challenges Foam Filter Fall 2010.doc","0":"Revised Challenges Foam Filter Fall 2010.doc","type":"doc","pageID":"124947213"}
{"":"Revised Challenges PSS Fall 2010.doc","0":"Revised Challenges PSS Fall 2010.doc","type":"doc","pageID":"124947220"}
Unable to render {include} The included page could not be found.