You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 11 Next »

Fall 2010 Challenges

Design (15) in Accel
Inlet Manifold (4) in TBD
Lime Feeder (4) in B60B
Tube Floc (4) in B60A
Stacked Filter (6) in B60B: two team members as joint members of Design team
Foam Filter (4) in B60B
Plate Settle Spacing (4) in B60A
Chemical Dose Controller (6) in B60A: two team members as joint members of Design team
(estimated number of students per team)

Team organization survey

Loading

Unable to render {include} The included page could not be found.

Loading

Loading

Unable to render {include} The included page could not be found.

Loading

Loading

Unable to render {include} The included page could not be found.
  • No labels