You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Fall 2010 Challenges

Design (15) in Accel
Inlet Manifold (4) in TBD
Lime Feeder (4) in B60B
Tube Floc (4) in B60A
Stacked Filter (6) in B60B: two team members as joint members of Design team
Foam Filter (4) in B60B
Plate Settle Spacing (4) in B60A
Chemical Dose Controller (6) in B60A: two team members as joint members of Design team
(estimated number of students per team)

Team organization survey

  • No labels