Sarah is continuing to write a program to determine the number and side of orifice holes on the Marcala plant launder.
Sub tasks include:

  • Collaboration with hydraulic design
  • Modification of the of launderer design program.
  • Calculating the affects of the additional sedimentation tank.

Leslie is working to determine the baffle spacing in tank A of the Marcala plant.
Subtasks include:

  • determining the acceptable G and Gtheta values in the tank
  • determining whether a surge tank is needed in order to protect the first baffle from the force of the water entering the tank