-
Created by user-4a1b2, last modified by user-9cca3 on Jul 24, 2009
You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 3
Next »
Design Meeting Minutes
Summer 2009 Minutes
7/24/2009
Accomplishments
- Changed the sed weirs to be the entire length of the inlet and exit channels and coded the autocad code.
Goals for Upcoming Week
- Work on final presentation, indiviudal contribution pages, challenges for next semester.
Horizontal Flow Group
Accomplishments
Issues
Goals for Upcoming Week
Accomplishments
Issues
Goals for upcoming week
Floc Tank Group
Accomplishments
- slots are drawn in the floc tank, and baffle widths are adjusted accordingly
- L.slot is now a basic input (the depth of the slot) set to a default of 5cm
Issues
- the up/down orientation of baffles in the last channel is backwards
- the length of the baffles do not seem to be correct
Goals for upcoming week
- meet with Monroe to determine the fate of baffles that coincide with the exit channel
- correct baffle orientation in the last channel
- correct baffle lengths
Materials List Group
Accomplishments
Issues
Goals for upcoming week