Accomplishments
- Fixed pipe frame
- Fixed launders
- Working on making the walls of the inlet chimneys the same thickness as the inlet channel walls. This will allow for much easier construction.
- Worked on our teach in
- Developed a new protocol for testing and committing files to the source forge, as well as a new protocol for committing new files to the Design Tool
- Worked on developing a protocol for users to submit any bugs they find with the Design Tool
Issues
- Need to better develop bug report on source forge
- Need to clean up the source forge
Goals for upcoming week
- Work on mid term wiki report
- Use the port area algorithm to determine a minimum pipe size to insert into the concrete inlet chimney and draw this in MtoA code
Floc Hopper Group
Accomplishments
- A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
-
Issues
- Difficult and unresolved issues
- Plans for action
Goals for upcoming week
Materials List Group
Accomplishments
- A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
-
Issues
- Difficult and unresolved issues
- Plans for action
Goals for upcoming week
Exit Channel Group
Accomplishments
- Completed coding of function that determines the minimum width of the exit channel (assuming the channel is square, that the head loss in the channel is 20 times smaller than the head loss in the launder, and that the channel must be at least 0.254 m to allow for a person to cap the launder).
Issues
- Need to add W.ExitChannelMin to the variable naming guide
- Need to document the code
Goals for upcoming week
- Finish documentation
- Begin work on another Design Team Goal
Entrance Tank Group
Accomplishments
- A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
-