Pilot Plant Meeting Minutes
Spring 2009 Minutes
3-6-2009
Working Group: 1
Accomplishments
- Recieved 100ft of 5/8" PEX tubing from McMasterCarr
- Fully assembled 2 rows of baffles and caulked any holes in the baffles
Outcomes
- The new tubing was not tight enough to use as a clamp, so it was decided to use them as clip on spacers to place in-between the baffles
- Decided to start with 6-inch spacing between baffles, but cut the spacers in 3-inch segments to give us flexibility in adjusting the spacing
Issues
- All that is left is to calibrate the turbidity meters and get the plan running
- Still need to get in contact with Sara about starting the plant up
Any Overall Team Comments:
We will post pictures soon. We didn't have a digital camera at the time of assembling the baffles.