Pilot Plant Meeting Minutes

Spring 2009 Minutes

2-20-2009

Unknown macro: {float}

Accomplishments

  • Built mockup of proposed new baffle system using 1/2" PVC pipe and rubber O-rings
  • Planned several versions for the actual baffle design (speced out components, priced out online)
    • 1/4" stainless steel pipe: $10/6 ft from McMasterCarr
      • Will need 4 pipes/channel
    • Tygon tubing (~$1.50/ft) to be used as sleeve around the pipe the keep clamps tight
    • Potentially using spring clamps ($13/100 clamps)
    • Potentially using Nitrile O-rings
    • $8/pk of 100 O-rings

Metrics

  • Quantitative and qualitative results from accomplishments and outcomes.
  • Potential metrics for unresolved issues.

Outcomes

  • A summary of resolutions based on what was accomplished.
  • New directions and ideas that result from these resolutions.
  • We need to clamp, drill press baffles when we build for the pilot plant

Issues

  • Difficult and unresolved issues
  • Plans for action